Skip to main content

Analytics & Reports

Detailed insights from your surveillance system

Detection Events Over Time

Detection events over time data
DatePPEZoneProximityErgonomicEgressResolvedTotal
2026-03-296644303522119197
2026-03-306548413524163213
2026-03-313358431624109174
2026-04-01704835119129173
2026-04-025759481017143191
2026-04-038560241023159202
2026-04-046653173413116183

Hourly Activity

Hourly activity data
HourViolations
12am4
1am7
2am7
3am4
4am9
5am6
6am43
7am41
8am18
9am30
10am30
11am24
12pm22
1pm21
2pm36
3pm34
4pm18
5pm20
6pm2
7pm10
8pm10
9pm2
10pm9
11pm2

πŸ’‘ Violations spike at shift change (6–7 AM, 2–3 PM)

Violations by Camera/Zone

Violations by camera zone data
ZoneCameraViolationsSeverity
Warehouse A – Dock 3CAM-A0358critical
Loading Bay – Camera 4CAM-B0442high
Chemical Storage – Cam 7CAM-C0741medium
Main Entrance – LobbyCAM-M0141medium
Parking Lot – Gate 1CAM-P0138medium
Rooftop HVAC – Cam 12CAM-R1230low
Break Room CorridorCAM-K0819low
Assembly Line B2CAM-B0218high

πŸ’‘ Camera 4 (Loading Bay) accounts for 41% of all PPE violations

critical
high
medium
low

Detection by Type

Detection by type data
TypeCountPercentage
PPE10236%
Zone Intrusion6021.2%
Proximity5519.4%
Ergonomic4315.2%
Egress238.1%
PPE(36%)
Zone Intrusion(21.2%)
Proximity(19.4%)
Ergonomic(15.2%)
Egress(8.1%)

Period Comparison

This Week vs. Last Week

Total Detections1,247Previous: 1,183
5.4%
PPE Violations234Previous: 261
10.3%
Avg Response Time4.2 minPrevious: 5.1 min
17.6%
Compliance Score91.4%Previous: 88.7%
3.0%
SLA Breaches6Previous: 11
45.5%
Period comparison data
MetricCurrentPreviousChange
Total Detections1,2471,183+5.4% (positive)
PPE Violations234261-10.3% (positive)
Avg Response Time4.2 min5.1 min-17.6% (positive)
Compliance Score91.4%88.7%+3.0% (positive)
SLA Breaches611-45.5% (positive)

Alert Resolution Rate

68%Resolved
Alert resolution rate data
MetricValue
Alerts Generated142
Acknowledged118 (83%)
Resolved97 (68%)
Avg. Resolution Time4.2 min
SLA Breaches6

Alerts Generated

142

Acknowledged

118(83%)

Resolved

97(68%)

Avg. Resolution Time

4.2 min

SLA Breaches (>15 min)

6

6 breaches

Repeat Offender Zones

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Warehouse A – Dock 3
Loading Bay – Camera 4
Assembly Line B2
Parking Lot – Gate 1
Chemical Storage – Cam 7
Main Entrance – Lobby
Rooftop HVAC – Cam 12
Break Room Corridor
Repeat offender zones data
ZoneDayViolations
Warehouse A – Dock 3Day 110
Loading Bay – Camera 4Day 17
Assembly Line B2Day 14
Parking Lot – Gate 1Day 18
Chemical Storage – Cam 7Day 11
Main Entrance – LobbyDay 111
Rooftop HVAC – Cam 12Day 19
Break Room CorridorDay 112
Warehouse A – Dock 3Day 24
Loading Bay – Camera 4Day 23
Assembly Line B2Day 210
Parking Lot – Gate 1Day 21
Main Entrance – LobbyDay 22
Rooftop HVAC – Cam 12Day 24
Break Room CorridorDay 22
Loading Bay – Camera 4Day 311
Assembly Line B2Day 35
Parking Lot – Gate 1Day 31
Chemical Storage – Cam 7Day 310
Main Entrance – LobbyDay 31
Break Room CorridorDay 39
Warehouse A – Dock 3Day 410
Loading Bay – Camera 4Day 43
Assembly Line B2Day 410
Parking Lot – Gate 1Day 44
Chemical Storage – Cam 7Day 411
Main Entrance – LobbyDay 44
Rooftop HVAC – Cam 12Day 49
Warehouse A – Dock 3Day 53
Assembly Line B2Day 57
Parking Lot – Gate 1Day 51
Chemical Storage – Cam 7Day 57
Main Entrance – LobbyDay 55
Rooftop HVAC – Cam 12Day 59
Break Room CorridorDay 54
Warehouse A – Dock 3Day 611
Loading Bay – Camera 4Day 68
Assembly Line B2Day 67
Parking Lot – Gate 1Day 61
Chemical Storage – Cam 7Day 610
Main Entrance – LobbyDay 61
Rooftop HVAC – Cam 12Day 66
Break Room CorridorDay 63
Warehouse A – Dock 3Day 71
Loading Bay – Camera 4Day 79
Assembly Line B2Day 72
Parking Lot – Gate 1Day 77
Chemical Storage – Cam 7Day 75
Main Entrance – LobbyDay 71
Rooftop HVAC – Cam 12Day 79
Break Room CorridorDay 711
Warehouse A – Dock 3Day 811
Loading Bay – Camera 4Day 83
Assembly Line B2Day 812
Parking Lot – Gate 1Day 83
Main Entrance – LobbyDay 812
Rooftop HVAC – Cam 12Day 85
Break Room CorridorDay 85
Warehouse A – Dock 3Day 96
Loading Bay – Camera 4Day 99
Assembly Line B2Day 910
Parking Lot – Gate 1Day 910
Chemical Storage – Cam 7Day 911
Rooftop HVAC – Cam 12Day 95
Break Room CorridorDay 911
Loading Bay – Camera 4Day 106
Assembly Line B2Day 1011
Parking Lot – Gate 1Day 1012
Chemical Storage – Cam 7Day 105
Main Entrance – LobbyDay 1011
Rooftop HVAC – Cam 12Day 103
Break Room CorridorDay 102
Warehouse A – Dock 3Day 119
Loading Bay – Camera 4Day 112
Assembly Line B2Day 116
Parking Lot – Gate 1Day 119
Chemical Storage – Cam 7Day 114
Main Entrance – LobbyDay 111
Rooftop HVAC – Cam 12Day 111
Break Room CorridorDay 115
Warehouse A – Dock 3Day 126
Loading Bay – Camera 4Day 127
Assembly Line B2Day 127
Parking Lot – Gate 1Day 121
Chemical Storage – Cam 7Day 123
Main Entrance – LobbyDay 129
Rooftop HVAC – Cam 12Day 122
Break Room CorridorDay 126
Warehouse A – Dock 3Day 138
Loading Bay – Camera 4Day 138
Assembly Line B2Day 139
Parking Lot – Gate 1Day 135
Chemical Storage – Cam 7Day 131
Rooftop HVAC – Cam 12Day 136
Break Room CorridorDay 139
Warehouse A – Dock 3Day 142
Loading Bay – Camera 4Day 142
Assembly Line B2Day 1412
Parking Lot – Gate 1Day 143
Chemical Storage – Cam 7Day 143
Main Entrance – LobbyDay 146
Rooftop HVAC – Cam 12Day 141
Break Room CorridorDay 142
Warehouse A – Dock 3Day 153
Loading Bay – Camera 4Day 155
Assembly Line B2Day 157
Chemical Storage – Cam 7Day 152
Main Entrance – LobbyDay 1511
Rooftop HVAC – Cam 12Day 153
Break Room CorridorDay 151
Warehouse A – Dock 3Day 163
Loading Bay – Camera 4Day 162
Assembly Line B2Day 169
Parking Lot – Gate 1Day 165
Chemical Storage – Cam 7Day 166
Main Entrance – LobbyDay 165
Rooftop HVAC – Cam 12Day 1610
Break Room CorridorDay 1610
Loading Bay – Camera 4Day 174
Assembly Line B2Day 171
Parking Lot – Gate 1Day 177
Chemical Storage – Cam 7Day 1710
Main Entrance – LobbyDay 177
Rooftop HVAC – Cam 12Day 1712
Break Room CorridorDay 173
Warehouse A – Dock 3Day 183
Loading Bay – Camera 4Day 1810
Assembly Line B2Day 184
Parking Lot – Gate 1Day 184
Chemical Storage – Cam 7Day 185
Main Entrance – LobbyDay 1810
Rooftop HVAC – Cam 12Day 1810
Break Room CorridorDay 186
Warehouse A – Dock 3Day 199
Loading Bay – Camera 4Day 193
Assembly Line B2Day 198
Parking Lot – Gate 1Day 196
Chemical Storage – Cam 7Day 198
Main Entrance – LobbyDay 199
Break Room CorridorDay 193
Warehouse A – Dock 3Day 203
Loading Bay – Camera 4Day 207
Assembly Line B2Day 2010
Parking Lot – Gate 1Day 2012
Chemical Storage – Cam 7Day 208
Main Entrance – LobbyDay 209
Rooftop HVAC – Cam 12Day 202
Break Room CorridorDay 204
Warehouse A – Dock 3Day 219
Loading Bay – Camera 4Day 213
Parking Lot – Gate 1Day 211
Chemical Storage – Cam 7Day 217
Main Entrance – LobbyDay 213
Rooftop HVAC – Cam 12Day 218
Break Room CorridorDay 2112
Warehouse A – Dock 3Day 226
Assembly Line B2Day 225
Parking Lot – Gate 1Day 227
Chemical Storage – Cam 7Day 227
Main Entrance – LobbyDay 2212
Rooftop HVAC – Cam 12Day 227
Break Room CorridorDay 222
Warehouse A – Dock 3Day 238
Loading Bay – Camera 4Day 234
Assembly Line B2Day 235
Parking Lot – Gate 1Day 2312
Chemical Storage – Cam 7Day 238
Main Entrance – LobbyDay 2312
Rooftop HVAC – Cam 12Day 2310
Break Room CorridorDay 2310
Warehouse A – Dock 3Day 241
Loading Bay – Camera 4Day 242
Assembly Line B2Day 248
Parking Lot – Gate 1Day 243
Chemical Storage – Cam 7Day 245
Rooftop HVAC – Cam 12Day 247
Break Room CorridorDay 246
Warehouse A – Dock 3Day 259
Loading Bay – Camera 4Day 258
Assembly Line B2Day 2510
Parking Lot – Gate 1Day 2511
Chemical Storage – Cam 7Day 256
Main Entrance – LobbyDay 253
Rooftop HVAC – Cam 12Day 2512
Break Room CorridorDay 257
Warehouse A – Dock 3Day 263
Loading Bay – Camera 4Day 268
Assembly Line B2Day 265
Parking Lot – Gate 1Day 2611
Chemical Storage – Cam 7Day 267
Main Entrance – LobbyDay 265
Rooftop HVAC – Cam 12Day 266
Break Room CorridorDay 2610
Loading Bay – Camera 4Day 272
Assembly Line B2Day 273
Parking Lot – Gate 1Day 274
Chemical Storage – Cam 7Day 271
Main Entrance – LobbyDay 278
Rooftop HVAC – Cam 12Day 277
Break Room CorridorDay 273
Warehouse A – Dock 3Day 286
Loading Bay – Camera 4Day 284
Parking Lot – Gate 1Day 287
Chemical Storage – Cam 7Day 284
Main Entrance – LobbyDay 285
Rooftop HVAC – Cam 12Day 2811
Break Room CorridorDay 2812
Warehouse A – Dock 3Day 293
Loading Bay – Camera 4Day 291
Assembly Line B2Day 299
Parking Lot – Gate 1Day 291
Chemical Storage – Cam 7Day 2910
Main Entrance – LobbyDay 298
Rooftop HVAC – Cam 12Day 291
Break Room CorridorDay 297
Warehouse A – Dock 3Day 306
Loading Bay – Camera 4Day 302
Assembly Line B2Day 305
Parking Lot – Gate 1Day 301
Chemical Storage – Cam 7Day 306
Main Entrance – LobbyDay 3012
Break Room CorridorDay 3011
0
1-3
4-7
8+

πŸ’‘ Zone 3 has had violations every single Monday morning for 6 weeks

Predicted Risk Score (AI)

Projected violations next 7 days: 94 (Β±12)

Predicted risk score data
DateActualPredictedRange
2026-03-29858585 – 85
2026-03-30878787 – 87
2026-03-31105105105 – 105
2026-04-01103103103 – 103
2026-04-02848484 – 84
2026-04-03103103103 – 103
2026-04-04838383 – 83
2026-04-05N/A95.483.4 – 107.4
2026-04-06N/A97.485.4 – 109.4
2026-04-07N/A93.981.9 – 105.9
2026-04-08N/A88.276.2 – 100.2
2026-04-09N/A93.781.7 – 105.7
2026-04-10N/A95.883.8 – 107.8
2026-04-11N/A96.884.8 – 108.8
Actual
Predicted
Confidence Band
⚠️ 3 zones flagged as HIGH RISK next week

Compliance Score Trend

93.4% β€” Top Quartile
Compliance score trend data
WeekYour ScoreIndustry AvgTarget
W189.1%78%95%
W290.2%78%95%
W390%78%95%
W489.6%78%95%
W589.2%78%95%
W690.3%78%95%
W789.2%78%95%
W891.2%78%95%
W992.2%78%95%
W1090.1%78%95%
W1191.6%78%95%
W1293.4%78%95%
Your Score
Industry Average (78%)
Target (95%)